Education - Chingford Foundation School





Previous Arrow Next Arrow






Construction of a 400m2 two-storey extension within an enclosed courtyard to provide Staff Accommodation and 3 classrooms. Mass concrete deep strip footings and a reinforced ground floor slab, steel frame and precast hollowcore concrete first floor. The roof is timber framed and ply decked with cut-to-falls insulation and a single ply membrane. External walls are rendered blockwork.  Internal finishes include acoustic suspended ceilings, plastered walls and carpet or vinyl floor coverings.
 
Construction of a 42m2 single storey extension including 4 offices and stores to the rear of the enclosed courtyard. 
 
Upgrading and refurbishment of the Reception and School Offices and provision of staff toilets on the ground floor, conversion of first floor staff accommodation into classrooms. New PPC aluminium windows and screens to replace 1960’s steel windows.
Project
Chingford Foundation School

Address
Nevin Drive, Chingford, London,  E4 7LT

Client
The Governors of Chingford Foundation School

Architect
ATP Group

Contract Value
£2,200,000

Download PDF

Would you like to learn more about this build? Contact:

Jerram Falkus Construction Limited
14 Anning Street
London
EC2A 3LQ

Tel: 020 7729 2424
Email: info@jerramfalkus.com

Contact Us

020 7729 2424

Jerram Falkus Construction Limited
14 Anning Street
London
EC2A 3LQ

Twitter

Jerram Falkus @JerramFalkus
EETV featured on BBC London news
at 6.30pm yesterday as Barking and
Dagenham’s part solution to the
Housing shortage

Enquiries