Education - Mostyn School




Previous Arrow Next Arrow





The works involve demolition of part of the school to clear the site for a new three storey School Kitchen and Classroom Block attached to the rear of the main school. 
 
Our works included employing a specialist catering kitchen subcontractor to fit out the kitchen, including all plumbing, ventilation and electrical services.
 
Other works included a single storey “infill” extension to provide a 900mm constant depth teaching swimming pool and a series of small single storey extensions at the front of the school in order to increase the floor area of classrooms.   
 
Extensive internal and external refurbishment works include:
 

  • Replacement roof coverings with cut-to-fall insulation and Sarna single ply covering
  • Replacement of all steel windows with high performance Polyester Powder Coated Aluminium Windows
  • Refurbishment of existing first and second floor accommodation including new plumbing and heating, new electrical power and lighting
  • New security walling, fencing and automated gates.
  • Playground and landscaping improvements.
Project
Mostyn School 

Address
Cowley Road, London SW9 6HF

Client
The Governors of Durand School

Architect
Hox Design

Contract Value
£3,400,000

Download PDF

Would you like to learn more about this build? Contact:

Jerram Falkus Construction Limited
14 Anning Street
London
EC2A 3LQ

Tel: 020 7729 2424
Email: info@jerramfalkus.com

Contact Us

020 7729 2424

Jerram Falkus Construction Limited
14 Anning Street
London
EC2A 3LQ

Twitter

Jerram Falkus @JerramFalkus
EETV featured on BBC London news
at 6.30pm yesterday as Barking and
Dagenham’s part solution to the
Housing shortage

Enquiries